Posta E32 - Eire
Eire
| Simu Kiambishi | 51 |
| Miji Husika | Carrick-on-Suir |
| Mitaa | Carrickbeg, Knocknaconnery |
| Timezone | Irish Standard Time |
| Kuratibu | 52.3492° / -7.4131° |
| Posta zinazohusiana | D15, D16, D17, E21, E25, E34, E41, E45, E53, E91 |
Ramani ya Posta E32 - Eire
Ramani inayoingiliana
Msongamano wa watu wa Eire
Msongamano wa watu: 65.9 / km²
| Location | Idadi ya Watu | Area | Msongamano |
|---|---|---|---|
| Eire | 4.6 million | 70,286.7 km² | 65.9 / km² |
Vyanzo: JRC (European Commission's Joint Research Centre) kazi ya GHS built-up grid
Mitaa
Usambazaji wa biashara na ujirani katika Posta E32 - Eire
Simu Kiambishi
Nambari za eneo la Asilimia zinazotumiwa na wafanyibiashara katika Posta E32 - Eire
Utoaji wa CO2 wa Eire
Carbon Dioxide (CO2) Uzalishaji wa hewa kwa Capita huko Tonnes kwa mwaka
| Location | Uzalishaji wa CO2 | Uzalishaji wa CO2 kwa Capita | Uzito wa uzalishaji wa CO2 |
|---|---|---|---|
| Eire | 44,326,890 tn | 9.57 tn | 630.7 tons/km² |
Vyanzo: [Kiunga] Moran, D., Kanemoto K; Jiborn, M., Wood, R., Többen, J., and Seto, K.C. (2018) Carbon footprints of 13,000 cities. Environmental Research Letters DOI: 10.1088/1748-9326/aac72a
Utoaji wa CO2 wa Eire
| Utoaji wa CO2 wa 2013 (tani/mwaka) | 44,326,890 tn |
| Utoaji wa CO2 wa 2013 (tani/mwaka) kwa mtu | 9.57 tn |
| Nguvu ya utoaji wa CO2 wa 2013 (tani/km²/mwaka) | 630.7 tons/km² |
Miji
Asilimia kubwa ya biashara na mji katika Posta E32 - Eire